25-003 Marymede CC Stage 5
최근 게시판
  • 29th 6월 2026, MOnday 29-06-2026

    Planned Activities
    Formworkers will complete the formwork for the Level 2 deck.

    Steel fixers will commence the bottom steel to the formwork deck.

    Plumbers will start the stormwater line on the live road. A separate toolbox talk must be completed and signed by all workers prior to commencing these works.

    Concretors will continue installing formwork to the amphitheatre.

    Electricians are working on installing power to the woodwork equipment in the Stage 4 high-risk areas.

    Important Notes
    All crews are to follow site-specific safe work procedures and supervision requirements.

    The stormwater works on the live road are to remain controlled under the separate toolbox and sign-on process.

    All personnel must be aware of adjacent work fronts and maintain clear communication throughout the day.

    High-risk areas are to be managed in accordance with the site safety plan and access restrictions.

    Site Coordination
    Ensure:

    Work areas are clearly separated where required.

    Plant, materials, and pedestrian movements are managed safely.

    Any changes to the sequence of works are communicated to all affected crews.

    All workers sign on to the relevant pre-starts before starting.

    Cleaner version for posting
    Today’s Site Activities

    Formworkers: Complete Level 2 deck formwork.

    Steel fixers: Start bottom steel to formwork deck.

    Plumbers: Commence stormwater line works on live road. Separate toolbox talk and sign-off required before starting.

    Concretors: Continue formwork installation to amphitheatre.

    Electricians: Install power to woodwork equipment in Stage 4 high-risk areas.

  • 26th 6월 2026, Friday tool box

    Toolbox Talk: Working Safely on Site
    Today’s focus is on working safely at heights, wearing the correct PPE, testing and tagging tools, keeping our work areas clean, and parking safely off site. These are simple controls, but they prevent injuries, damage, delays, and complaints. Working at height is a high-risk activity, and Safe Work Australia says risks must be eliminated or minimised so far as is reasonably practicable, with proper controls in place.

    1. Working at heights
    Any work where there is a risk of falling must be planned and controlled before we start. Use the correct fall protection, follow the SWMS, and do not take shortcuts such as standing on unsafe surfaces or using equipment incorrectly. Keep platforms, ladders, access ways, and work areas clear so no one is exposed to a fall hazard.

    2. PPE
    Wear the required PPE at all times: helmet, hi-vis, safety boots, gloves, eye protection, and any task-specific protection needed for the job. PPE is the last line of defence, so it must be worn correctly and kept in good condition. If your PPE is damaged, missing, or not suitable, report it before starting work.

    3. Test and tag tools
    All electrical tools must be tested and tagged before use, and any damaged leads, plugs, or tools must be removed from service immediately. Never use untested or suspect equipment, and never bypass safety devices. If a tool looks unsafe, stop using it and report it straight away.

    4. Housekeeping
    Everyone is responsible for cleaning up after themselves. Put tools away, remove waste, keep walkways clear, and do not leave materials or offcuts in access areas. Good housekeeping reduces slips, trips, falls, and lost time.

    5. Lunch room
    The lunch room must be left clean and tidy after use. Put rubbish in the bins, wipe down tables, and leave the area ready for the next crew. A clean lunch room is part of site discipline and shows respect for everyone on site.

    6. Parking
    There is no parking on site, so all vehicles must be parked on Cooks Road or in the approved off-site parking area. Do not block driveways, access points, neighbours’ property, or traffic routes. Good parking control helps keep the site safe, legal, and professional.

    Closing message
    Safety is everyone’s responsibility. If you see a fall risk, unsafe tool, poor housekeeping, or a parking issue, stop and report it before it becomes an incident. Let’s work safely, keep the site tidy, and look after each other.

  • 22nd 3월 2023, WorkSafe EWP Standard - November 2022

    EWP SWMS to be revised to include:
    * EWP familiarity training for different types and models of EWPs.
    * Safety Observers to be licensed or ticketed, safety observers to warn the operator(s) of hazards and ensure prompt rescue, need to have line of sight to the EWP operator(s), not to leave the work area until the EWP is lowered to a stowed position and the operator has alighted from the platform

현장 날씨 예보
현재 현장 날씨

마지막 업데이트 날짜: 오후 12:21
온도: 15씨 (앱 13씨)
풍속: 4KMH
최대 풍속: 7KMH @오전 11:21
오전 9시부터 비가 내림: 0.2음음
최저 기온: 1씨 @오전 7:44
최고 온도: 15씨 @오후 12:20
돌풍: 13KMH
최대 돌풍: 13KMH @오후 12:21


관찰 출처 - Bureau of Meteorology
관찰 위치 - Viewbank, VICTORIA
시간대 - 오스트레일리아 동부 표준시
예측 - 토요일, 1 8월

Sunny.
: 7씨 맥스: 16씨
비 올 확률: 20%


예측 출처 - Bureau of Meteorology
예측 위치 - Watsonia, VICTORIA
시간대 - 오스트레일리아 동부 표준시
내일 - 일요일, 2 8월

Showers.
: 7씨 맥스: 14씨
비 올 확률: 90%
예상 강우량: 1 에 5음음


중요한 현장 문서
현장에 처음 오셨나요?

이 현장의 개인 보호 장비(PPE) 요구 사항을 알고 있습니까?

현장 첫날에 올바른 안전 장비를 갖추고 있는지 확인하십시오.

현장 개인 보호 장비 요구 사항 보기

현장에 도착하면 더 빨리 작업을 시작하세요.

편리한 시간에 온라인으로 현장 등록을 완료하고 시간을 절약하세요.

등록 시작

현장에 처음 오셨나요?

이 현장의 개인 보호 장비(PPE) 요구 사항을 알고 있습니까?

현장 첫날에 올바른 안전 장비를 갖추고 있는지 확인하십시오.

현장 개인 보호 장비 요구 사항 보기

현장에 처음 오셨나요?

현장에 도착하면 더 빨리 작업을 시작하세요.

편리한 시간에 온라인으로 현장 등록을 완료하고 시간을 절약하세요.

등록 시작